Ashiyan Sanat provides engineering and implementation support for power, distribution, MCC and control panels in industrial and large-scale projects across Iran. Each assignment begins with the operating problem and site conditions, not a predetermined equipment list.
How the scope is defined
The engineering team reviews load data, fault level, environment, protection requirements and installation conditions. This review establishes the real boundary of work, identifies missing information and separates urgent corrective actions from optional improvements.
Typical project stages
Depending on the assignment, the scope may include engineering, component selection, assembly coordination, wiring, inspection, testing and as-built records. Deliverables, responsibilities and acceptance criteria are agreed before execution so the client can compare the technical and commercial proposal clearly.
What the client receives
The objective is safe, serviceable panels aligned with the actual duty of the project. Drawings, settings, test results and handover records are included when they form part of the agreed scope, helping operations and maintenance teams work with reliable information after commissioning.
Information required for an initial review
Incomplete documentation does not prevent an initial discussion. After reviewing the available information, Ashiyan Sanat will identify the next useful step, whether that is a remote document review, a site visit or a defined engineering proposal.